HB Sound & Lighting

HB Event Stage Designer

Build the production as a system.

Plan d&b loudspeakers, amplifier requirement, lighting, RGB lasers, atmosphere and venue power in one 3D view. Equipment dimensions come from manufacturer data; the electrical and laser sections are planning aids, not engineering certification.

3D preview unavailable in this browser.
Orbit, zoom and pan. Speaker geometry is model-specific and scaled in metres.12m × 7m deck · 25 major items
d&b audiotechnik Y8 manufacturer reference

PA reference

d&b audiotechnik Y8

630W × 257H × 375D mm · 20 kg

Manufacturer specification
d&b audiotechnik V-SUB manufacturer reference

Sub reference

d&b audiotechnik V-SUB

700W × 606H × 728D mm · 64 kg

Manufacturer specification

Amplification

d&b amplifier requirement

2 × D80 · 4 RU

8 × Y8: 4 amplifier channels

4 × V-SUB: 2 amplifier channels

D80-equivalent requirement: 2 amplifiers / 4 RU

⚠ 2 D80 channels remain spare in the calculated rack allocation.

Calculated requirement only. The exact HB stock count of D80/D20 amplifiers has not been verified in this planner, so it is not invented here.

Venue power / GPO map

Map the actual electrical topology

Never infer circuit or phase from which wall a GPO is on. Outlets in different rooms/walls can share a circuit, and nearby outlets can be on different circuits/phases. Verify the actual distribution with venue documentation or a licensed/authorised electrician. Do not open switchboards or carry out electrical work from information in this planner.
L1
0.0 A
L2
0.0 A
L3
0.0 A

⚠ GPO / circuit A: circuit/phase is unverified. Do not infer it from the wall or room location.

⚠ GPO / circuit B: circuit/phase is unverified. Do not infer it from the wall or room location.

⚠ Touring distro feed: circuit/phase is unverified. Do not infer it from the wall or room location.

⚠ Venue supply topology is unknown. Confirm single-phase/three-phase supply and distribution before relying on load totals.

Laser and atmosphere safety

RGB beam graphics are a planning visual only. Do not use this page as a laser safety assessment or assume a beam path is safe for audience scanning. Beam termination, exclusion zones, mounting, emergency control and applicable state/territory requirements must be assessed for the actual venue and system.

Fog/haze machines are included as physical and electrical loads, but ventilation, alarms, venue permission, fluid handling and show operation still need site-specific checks.